          (完整版)东风节制闸设计说明书说明书含图纸毕业设计 - 下载本文

          首先拟定水闸地下轮廓线型式,初步计算所需长度,然后依次确定闸室底板、铺盖长度及材料,设计反滤层及排水孔位置,最后计算闸基渗透压力,绘制渗透压力分布图。

          3、闸室的布置设计及闸室稳定性计算 闸室轮廓尺寸确定

          由水力条件及水闸功用,确定闸室总宽、闸顶高程、闸墩、闸门、底板的型式与尺寸,闸室上部结构的工作桥、交通桥、启闭设备的型式与尺寸。

          闸室稳定计算

          选取计算单元,计算作用于闸室的荷载,并按计算条件进行组合。分别按完建期,正常蓄水期,正常蓄水加特殊荷载组合三种工况进行闸室抗滑稳定性和地基承载力验算,并对地基应力分布状态及沉降差进行计算分析,判断水闸地基是否满足承载力、抗滑稳定和变形要求。

          闸基深层滑动及地基沉降量计算

          根据设计资料给出的土壤物理力学特性指标,验算在荷载作用下基础是否发生带动一部分地基土向下游深层滑动,并确定是否进行地基沉降量计算。

          4、两岸连接建筑物——岸、翼墙的结构型式,布置及稳定性计算

          由闸室的结构尺寸及地基条件,确定岸、翼墙的平面布置型式,结构型式,断面尺寸。

          按完建期和正常蓄水期两种工况,对岸、翼墙的地基承载力,基底最大最小应力比值及基底面抗滑稳定进行计算。

          上游翼墙的防渗设施及下游翼墙的排水设施设计。 5、闸室结构计算 闸墩应力分析

          将闸墩视为固接于底板上的悬臂梁,以闸墩和底板的结合面作为计算控制面,分别按运用期(闸门关闭挡水)和检修期(一孔检修其它孔过水)两种工况,计算中墩墩底水平截面垂直正应力、剪应力、门槽应力、墩底水平截面侧向应力,并分析计算结果,进行配筋设计。

          底板应力分析

          以闸门为界,将底板分为上下两部分,分别在两部分中央垂直水流方向取单宽板条进行分析。按完建期和运用期两种工况,计算作用于板条上的荷载。包括底板自重,中、边墩及上部结构重,水重 ,扬压力及不平衡剪力并对其进行分配,按弹性地基梁郭氏法查表计算,求得地基反力及计算板条各截面的内力,分析计算结果进行底板配筋设计。

          6、平面钢闸门设计 门叶结构

          门叶结构布置:确定门叶结构所需的各种构件,数目及所在位置,梁格及联结系的型式、连接方式,行走支承及边梁的型式。

          面板设计:在充分发挥面板强度的前提下,设计一经济合理的面板厚度。并在主梁截面确定之后校核面板的局部弯曲与整体弯曲的折算应力强度。

          水平次梁、顶、底梁设计:均采用型钢。由各构件的内力,选择各梁的截面,并进行强度、刚度验算。

          主梁设计:确定主梁数目、位置、截面型式,断面尺寸,截面改变,翼缘焊缝设计及主梁局部稳定验算。

          竖直次梁及横纵向联结系设计:确定其型式及位置,由内力计算选择截面尺寸及强度验算。

          边梁设计:由行走支承确定边梁结构型式,按构造要求设计边梁,并对其危险截面进行强度校核。

          行走支承设计:确定其结构型式、尺寸,并进行强度验算。 导向装置设计:确定反、侧行走支承型式,位置及连接方式。 止水、吊耳设计:确定止水型号及布置方式,由启门力设计,吊轴及吊耳板尺寸并对吊耳板强度进行验算。

          门槽埋设构件

          确定门槽各轨道型式,断面尺寸,对主轨进行强度校核。 确定止水座及门槽护角构件型式。 闸门锁室装置设计。 启闭机械选择

          计算启门力,确定启闭机类型、型号。 计算闭门力,校核是否应采取工程措施降门。 吊具设计:由启门力设计吊索。

          关键词:水闸;闸室;平面闸门;防渗排水;主梁

          Design the leader

          The sluice is irriated and arranged one of the main buildings among the project,it is a kind of low flood peak water conservancy project builing utilizing the gate to block water or sluice, can control the adjustable water level of the flow. While closing the gate, it can block the big conservation storage, the tide of the shelf or improving the water level in front of the floodgate, can release floodwater, drain flooded fields or supple water of the downstream river or the channel while opening the gate. We design the check gate built on plain and river mainly this time.

          The check gate generally crosses over the river to build, used in dry season conservation storage, redound water level for sluice

          fetch water, turn on floodgate release floodwater flood period. In canal is it prop up to lie in generally among the department, lateral canal divide into water mouth low reaches slightly, use for redounding the water level of branch canal, for propping up, the lateral canal fetch water

          This design is divided into six following parts mainly: 1.It is analysed that the materials and sluice pivot are fixed up.

          The materials that offered are basic bases designed, in order to edable designing the achievement safe, suitable, economy, should be familiar with and analyse various kinds of materials at first, for instance topographical, geological situation, each about according to floodgate location, topography, geology, rivers, etc, terms and every building of function, characteristic, use demanding to confirm the pivot is decorateds of the pivot this, accomplish the structure compactness, rational, coordinates, beautiful.

          2.Water conservancy is calculated:

          Including floodgate , is it can is it wash the design, prevention of seepage drain off water and design to defend to disappear mainly.

          ⑴The the floodgate give design flow definitely confirm according to sluice form and materials that draft above floodgate checking computations plan floodgate defend and print designing for dispel water flow through energy of floodgate,is it disappear strength pool, sea overflow and defend and wash the trough to design.

          ①Disappear in the strength pool calculate in design water storage level under the terms, gate turn on in various kinds of form, operating mode of operation and symmetrically, three and different flow of letting out while opening the to need, want according to condition of can disappearing,is it disappear depth, strength of pool to calculate, thickness of the length baseplate and construction material used.

          ②The sea overflowing disappear strength pool can dispel rivers 50% energy,other energy all over the place to dispel from sea,according to different letting out amount of the sluice,confirm long degree and construction material of sea.

          ③ Defend and wash the trough calculate sea overflow end wash form and size to defend to design.

          ⑶The prevention of seepage drains off water and designs: Draft the underground outline line at first, confirm the length tentatively, then confirm the floodgate room baseplate, length of the bedding and material sequentially, design and strain layer and drain off water in the instead, calculate the base osmotic pressure of the floodgate finally, draw the distribution map of the osmotic pressure.

          3.The floodgate room is decorated and floodgate room stability is calculated:

          ⑴Confirm the size of the outline line of floodgate room confirmed the floodgate room is always wide by the water conservancy condition, floodgate , size and floodgate room top structure job

          福利:打开支付宝首页搜索“608066754”即可领取红包,吃个早点,买杯饮料肯定够了,红包加倍最高可以领取99元红包!

          「觉得内容不错,打赏支持一下」

          南京廖华

          觉得内容不错,打赏支持一下

          使用微信扫描二维码完成支付

          福利:打开支付宝扫描二维码领红包,可免费下载资料 微信:17702577729




          买马开奖结果资料-买马开奖网站-买平特一肖能赚钱吗